Find the sentence on page 177 before it finds you.

NIX reads your plans, specs and addenda, then hands back the scope, exclusions, RFIs, risks and forms for your trade. Every flag points to the page it came from. You stay the estimator.

Your first package is free: 1 analysis, up to 80 pages and 2 trades, for 14 days. Exports and revisions unlock on a paid plan, and free analyses are limited per company.

Outputs
24 outputs from one package
Trades
34 trades, new profiles in Beta
Sample
Sample package: 94 citations on 5 documents
Electrical Scope of Work 02.27.2026 · P. 1 · S01510EXACT

This service shall have a minimum of (16) double duplex receptacles, in two locations (at opposite ends of the store near an exit. Power strips are prohibited from being used on the project for any reason.

Electrical Contractor is responsible for all electrical inspections and permits as needed.

Supply and install 200-amp temp power pole and meter base for utility to connect to.

BMS panel will be supplied and installed by Sheetz Installation Dept.

All circuits to have dedicated neutrals.

Sample package, one recorded output. Not a live analysis.
One cell per citation
  • Exact
  • Unverified
  • Near